Projects Archives - Baltic Art Studio

McWilliams Chapel Stained Glass Restoration | Chicago

1st Presbyterian Church of Chicago 3 2020

Baltic Art Studio restored the historic stained glass windows of McWilliams Chapel at First Presbyterian Church of Chicago. The 2019–2020 project included conservation, recreation of lost glass, releading, structural repair, cleaning, and reinstallation.

John La Farge Stained Glass Restoration | St. Magdalen

John La Farge St. Magdalen by the Tomb of Christ stained glass window after restoration

In 2026, Baltic Art Studio conserved and restored St. Magdalen by the Tomb of Christ, a rare 1889 stained glass window by American artist John La Farge. The project included research, documentation, multilayered glass conservation, repair, recreation of missing details, releading, and structural restoration.

Jonynas Stained Glass Conservation | Jaunimo Centras

Historic Vytautas Kazimieras Jonynas stained glass window prepared for removal and conservation

Baltic Art Studio assisted Jaunimo Centras with the safe removal, transport, and conservation of a historic stained glass window by Lithuanian artist Vytautas Kazimieras Jonynas. The window will become part of a new home for Lithuanian heritage in Chicago.

Franz Xaver Zettler Stained Glass Restoration | St. Hyacinth Basilica

Franz Xaver Zettler stained glass window detail during restoration at St. Hyacinth Basilica in Chicago

Baltic Art Studio completed the conservation and restoration of two historic Franz Xaver Zettler stained glass windows at St. Hyacinth Basilica in Chicago. The 2025 project included structural stabilization, glass repair, releading, studio conservation, and complex onsite work at height.

Tiffany Studios Stained Glass Restoration | Private Collection

Restored Tiffany Studios stained glass window in Baltic Art Studio workshop

In 2018, Baltic Art Studio conserved and restored a circa 1890 Tiffany Studios stained glass window from a private collection. The project included historical research, documentation, glass stabilization, careful cleaning, and full structural releading.